Finishing costs in Syria: Price per square meter and apartment finishing budget

2026-10-15

322 Views

Finishing costs in Syria: Price per square meter and apartment finishing budget

Would you like to learn more about the Sham View project?

Choose the property that matches your lifestyle

go back

We have a range of options for you.

go back

Thank you!

Thank you, we have received your request, and we will contact you as soon as possible.

Knowing the price of the apartment in its shell state is not enough to determine the total amount you need before you can live in it. Between receiving the raw walls and receiving the key, there is a long series of works, starting with electrical and plumbing installations, passing through insulation, plastering, and flooring, and ending with doors, kitchen, and paint. The final bill varies according to the delivery condition, the level of specifications, the type of materials, labor costs, and the items actually included in the offer.

In this guide, we present published price ranges for finishing per square meter with their dates and issuing parties, explain what the price per meter includes and what may be calculated separately, then provide a practical method to calculate the budget for a 100-square-meter apartment, and clear criteria for comparing contractor offers before contracting.

How much does finishing cost in Syria?

There is no single price for finishing per square meter that applies to all apartments in Syria; the price is determined by the level of finishing, scope of agreed works, and the property’s condition at the start. However, published estimates can provide an initial idea of the differences between levels.

Yahya Construction Company published estimates for the price of residential finishing per square meter in dollars, and their article shows the last update was on May 4, 2026:

Finishing Level

Estimated Price per Square Meter (According to Source)

Economic

$80–120

Good / Medium

$130–180

Deluxe

$200–300

Super Deluxe

$350–600 and above

Source: Yahya Construction Company, last visible update May 4, 2026.

These numbers are estimates issued by a contracting company, not an official average of Syrian market prices, and do not represent confirmed prices for October 2026; prices of materials, labor, and exchange rates may change within a few months. The same source indicates that aluminum and wooden joinery are often calculated separately in economic and medium contracts, meaning that the price per meter is not automatically all-inclusive.

Area alone is not enough to determine the cost. For example, the term “Deluxe” does not mean the same thing to all contractors, so any finishing level requires written specifications that define the type, size, and quantity of materials in order to compare two offers.

What is the difference between finishing cost and construction cost?

An apartment usually goes through three main delivery conditions:

  • Shell state: The structural frame is complete (columns, ceilings, and usually block walls), without final installations or finishes.

  • Finishing: The set of works that transform the apartment from shell state to a livable condition, from electrical and plumbing foundations to paint and doors.

  • Turnkey delivery: An apartment ready to live in, according to agreed specifications, which may vary from one developer to another.

This means that finishing is part of the total construction cost. If your offer includes both construction and finishing, you should not add the finishing price per meter again. For information on the cost of the structure, construction materials, and execution fees, you can refer to the guide Construction Costs in Syria, while here we focus on the finishing budget and preparing the apartment for living.

What does the price per meter of finishing include, and what may be calculated separately?

The most important question when reading any price per meter is not “How much?” but “For what?”. Two offers at the same price may differ greatly in what they include, and a cheaper offer may become more expensive after adding the excluded items.

Finishing works are usually divided into main groups: electrical and plumbing foundations, insulation, plastering and surface preparation, flooring and wall cladding, painting, then items that vary between offers, such as doors, windows, sanitary ware, and kitchen. There are other items that may be calculated separately, such as interior design, engineering supervision, material transport and lifting to floors, and debris removal.

As for heating, air conditioning, solar energy, electrical appliances, and furniture, these should not be assumed to be included in the finishing price; some offers include only the foundation for them, some include full installation at higher levels, and some exclude them entirely.

The following table helps you turn any offer into a clear, comparable checklist:

Item

Is it included in the offer?

Specifications and quantities to be specified

Electrical foundation

Specified in the offer

Number of points and sockets, cable cross-section, type of panel and breakers

Plumbing foundation

Specified in the offer

Type of pipes, number of outlets, number of bathrooms and kitchens

Insulation

Specified in the offer

Type and location of insulation, especially bathrooms, kitchen, and roofs

Plastering

Specified in the offer

Area of executed surfaces, rough and smooth, materials and labor

Flooring and wall cladding

Specified in the offer

Type of material, size, grade, waste percentage, adhesive and grout

Painting

Specified in the offer

Number of coats, putty, type of paint, area of walls and ceilings

Interior doors

May be calculated separately

Type, number, accessories

Windows and aluminum

May be calculated separately

Type of profile and glass, area or number of pieces

Sanitary ware

Specified in the offer

Sets, mixers, heater, origin and grade

Kitchen

May be calculated separately

Length in linear meters, type of wood, surface, accessories

Heating and air conditioning

Not assumed included

Foundation only or full installation?

Design, supervision, transport

May be calculated separately

Who bears the cost? Is there a separate fee?

The starting point also varies according to the delivery condition; some under-construction apartments are delivered as shell, some with partial or full finishing. Therefore, if you are following Under Construction Properties in Syria, check the written delivery specifications in the contract before estimating the finishing budget, so you do not calculate works the developer will handle, or miss works that will be your responsibility.

The difference between economic, medium, and luxury finishing

Finishing level names such as “Economic” and “Deluxe” are common trade terms, not unified standards with binding specifications. Therefore, the content of each level varies from one contractor to another, and the real standard is the written specifications list.

It is important to distinguish between two things: quality of foundation and cost of decoration. Electrical, plumbing, and insulation works are hidden behind walls and are difficult to repair later, while decorations, concealed lighting, and suspended ceilings are cosmetic additions that can be postponed or simplified. Economic finishing does not necessarily mean unsafe execution if the foundation is sound, and imported materials are not always better than suitable local ones.

Level

Usual Specifications

What Increases the Cost

What to Check

Economic

Local materials, standard ceramic, simple paint, basic installations

Increasing number of bathrooms or electrical points

Quality of foundation and insulation, exclusion of aluminum and joinery

Medium

First-grade ceramic or porcelain, good doors, simple gypsum

Gypsum decorations, large tile sizes

Brands and grades of materials, what the price includes in doors and windows

Deluxe

Porcelain, concealed lighting, modern kitchen, may include heating

Additional decorations and equipment

Define specifications precisely, is heating foundation or full installation

Super Deluxe

Marble, smart systems, advanced equipment

Imported materials and custom design

Details of each item, material origin, delivery time

Descriptions are based on the classification published by Yahya Construction Company and may vary between contractors.

How is the finishing cost of the apartment distributed among the works?

There is no fixed percentage to rely on for distributing the finishing budget among the works, as the relative weight of each item varies according to the apartment and specifications. It is more useful to understand what determines the cost of each group of works.

Electricity, plumbing, and foundation for heating and air conditioning

The cost of electrical foundation is determined by the number of points and sockets, expected loads, routing of installations, and type of panel. Plumbing foundation is especially affected by the number and location of bathrooms and kitchens. If you plan to install central heating or air conditioning later, it is usually more economical to do the foundation at this stage instead of breaking the finishes later.

When reading the offer, distinguish between three things: foundation materials, final equipment such as switches, lighting, sanitary sets, and labor costs.

Insulation, plastering, and surface preparation

The condition of the walls at delivery determines the amount of work required; uneven walls or areas exposed to moisture need treatment before plastering. Insulation requires special attention in bathrooms, kitchen, and roofs, because any defect may require costly rework later, far exceeding what could have been saved initially.

For reference prices, the “Kelfa” platform lists a reference price for internal rough and smooth plastering, including materials and labor, between $2.5 and $5 per square meter, as of June 15, 2026. The platform describes these numbers as registered reference prices, not direct supplier offers. This price is multiplied by the area of executed surfaces, not the apartment’s floor area.

Flooring and wall cladding

The cost of flooring is determined by the type of material (ceramic, porcelain, marble, parquet), its size and grade, then by the actual executed area. The calculation does not stop at the material price; you must add adhesive, grout, cutting and installation labor, and waste percentage, which usually increases with larger sizes and complex designs. Wall cladding in bathrooms and kitchens is calculated by the area of walls covered up to the agreed height.

Doors, windows, kitchen, and paint

The unit of pricing varies between these items, which is a common source of calculation errors:

  • Doors: Usually priced per piece.

  • Windows and aluminum: Priced per square meter or per piece depending on the contractor.

  • Kitchen: Priced per linear meter. The “Kelfa” platform lists reference prices as of May 29, 2026, for Syrian kitchens in Damascus and Aleppo between $150 and $280 per linear meter, and for Turkish kitchens between $340 and $580 per linear meter.

  • Paint: Priced per square meter of painted surfaces. The same platform lists a reference price for full Syrian paint (putty, sanding, and final paint) between $3 and $6 per square meter, as of June 15, 2026.

The paint area does not equal the apartment’s floor area; it includes walls and ceilings, is affected by ceiling height, number of rooms, and layout, and openings and ceramic-covered parts are subtracted. Therefore, the paint area is often much larger than the floor area.

How much does it cost to finish a 100-square-meter apartment in Syria?

The finishing budget can be estimated by the following formula:

Estimated budget = approved area × price per meter for the agreed scope of work + excluded items + contingency

To clarify the calculation method, let’s take a hypothetical example of a 100-square-meter apartment, delivered as shell, to be finished at a “Good / Medium” level according to Yahya Construction Company’s estimates published in May 2026:

Item

Calculation

Estimated Result

Basic finishing (medium level)

100 m² × $130–180

$13,000–18,000

Syrian kitchen (assumption: 4 linear meters, not included in the offer)

4 × $150–280 (“Kelfa” prices, May 2026)

$600–1,120

Total before contingency

$13,600–19,120

Planning contingency 10% (assumption for example)

10% of total

$1,360–1,912

Estimated budget

About $15,000–21,000

Add to this what the offer may exclude in aluminum and wooden joinery, depending on the model, quantity, and prices at the time of contracting.

Important notes for reading the example:

  • This is a calculation based on published estimates, not an actual offer or executed invoice.

  • If the kitchen is included in the agreed price per meter, do not add it again.

  • Do not add the prices of detailed items, such as paint and plastering, to a price per meter that already includes them; they are part of it.

  • The contingency percentage is a planning assumption to cover modifications and surprises during execution, not a fixed rule.

  • The example does not include furniture, electrical appliances, solar energy, or air conditioning.

If you want to calculate an individual item not included in the offer, calculate it by its correct unit. For example: if the painted walls and ceilings area in the apartment is 300 m² (illustrative number to be replaced by actual measurement), the paint cost according to “Kelfa” reference prices would be 300 × $3–6 = $900–1,800.

Why does the finishing cost differ between two apartments of the same area?

You may receive two radically different offers for two apartments of the same area, for practical reasons:

  • Number of kitchens and bathrooms: Each additional bathroom means extra installations, insulation, cladding, and sanitary sets.

  • Window area and ceiling height: Large windows increase the cost of aluminum and glass, and high ceilings increase paint and plastering area.

  • Condition of installations and surfaces: An old apartment needing debris removal and re-foundation differs from a new shell apartment.

  • Floor and ease of material entry: Upper floors without a working elevator may require a crane or extra carrying fees.

  • City and availability of workshops: Transport costs and availability of materials and labor vary between cities and regions.

  • Design complexity and specification level: Suspended ceilings, concealed lighting, and special details increase cost and time.

No published, comparable data is available to set precise difference ratios between provinces, so requesting local offers with unified specifications remains the best way to compare.

How to reduce finishing costs and compare contractor offers?

Reducing the cost does not mean choosing the cheapest offer, but controlling the scope and preventing unexpected expenses. Here are the main practical steps:

  1. Specify specifications and quantities before requesting prices: Prepare a written list of material types, sizes, and quantities, and ask each contractor to price based on it.

  2. Compare offers that include the same scope: Use the previous items table to ensure the offers are equivalent before comparing numbers.

  3. Separate materials from labor when needed: This helps you review material prices yourself and understand the source of differences.

  4. Agree in advance on how to price modifications: Specify in the contract how additional works and any change in specifications are priced.

  5. Minimize design changes during execution: Every change after starting may mean wasted materials and additional time.

  6. Save on decorations, not on foundation: Suspended ceilings and decorative lighting can be postponed, but installations and insulation are difficult to fix later.

  7. Link payments to completion stages: This protects both parties and makes it easier to track progress.

Finally, calculate the total cost, not just the purchase price. An apartment in shell state may seem cheaper, but adding the finishing budget and execution time may change the comparison. If you are comparing between buying an apartment that needs finishing and a completed one, check ready-to-move properties in Syria and compare the total cost, specifications, and time needed to move in.

Building and finishing materials: from apartment needs to opportunities for companies and suppliers

The questions an apartment owner faces about materials, prices, and supply reflect a broader picture; every finishing project depends on a chain of manufacturers, suppliers, and distributors. This sector needs product variety, clarity in specifications, and the ability to display, store, and distribute materials efficiently.

In the general context, the World Bank estimated in a report published on October 21, 2025, the cost of reconstructing damaged physical assets in Syria at about $216 billion, of which about $75 billion is for residential buildings, based on damage assessment for the period 2011–2024. This figure gives an idea of the overall construction need, but does not represent the size of the finishing market nor is it an indicator of guaranteed returns for any business activity.

Amar City in Hassia: An opportunity to establish a display, storage, and distribution center

Amar City is a project specialized in building and finishing materials in the Hassia area of Homs Governorate, presented as a business center combining display, storage, and distribution spaces. For companies considering establishing a commercial presence in this sector, the Amar City for Building and Finishing Materials in Hassia project offers a model that combines these functions within a single specialized project.

The project is based on the concept of “Display – Store – Distribute – Expand,” targeting manufacturers, suppliers, and brands operating in building and finishing materials who need a display point for their products, storage space, and a distribution base.

The project adopts a long-term investment and operation right model for 15 years, not ownership of units. The project is not a direct store for buying apartment materials or an entity for executing finishing works, but a business platform aimed at companies operating in this sector.

Plan your property budget with Imtilak Real Estate

Choosing the right property is inseparable from the cost of preparing it; the cheapest apartment at purchase may require a finishing budget that changes the whole calculation. Therefore, it is useful to look at the purchase price, delivery condition, preparation cost, and moving time as one unit when comparing.

You can contact the Imtilak Real Estate team to compare available properties according to your budget and the delivery condition that suits you, whether you are looking for a ready-to-move apartment or an under-construction property. If you represent a company or brand in the building and finishing materials sector, you can inquire about investment and operation opportunities available in Amar City.